I-5 bridge over Pendleton Avenue The bridge previously had incidents where overweight vehicles would hit the bridge. (WSDOT)
I-5 corridor improvements project JBLM Bird’s-eye view of work on I-5 which included extending noise walls on Joint Base Lewis-McChord (WSDOT)
New roundabout north of Barksdale Station The new connection between DuPont and I-5 is taking shape. The new route to the highway
will go up and over the existing train tracks. (WSDOT)
I-5 corridor improvements project JBLM WSDOT does a lot to keep people moving during construction. All lanes of I-5 will be
kept during the work for the exception of night lane closures. (WSDOT)
new I-5 and Steilacoom-DuPont Road interchange This design visualization shows the final design of the a new I-5 and Steilacoom-DuPont Road
interchange at exit 119 in Pierce County. The design of the new bridge structure includes a half
diverging diamond interchange with barrier protected pedestrian access. The new overpass will
take travelers over the railroad and eliminate the existing at-grade railroad crossing.
The new overpass will connect with Steilacoom-DuPont Road using a roundabout, built for all
vehicle types including trucks, busses and emergency response vehicles. (WSDOT)